Construction Quality Assurance

Quality assurance that catches issues before they cost you

Independent quality oversight on construction sites across Australia. We verify what gets built matches what was specified, before defects become handover problems.

Quality assurance that protects specification, programme, and the asset you're handed at completion.
Inspection and Verification
Independent site inspections, hold and witness points, surveillance testing, and verification that construction matches specification and drawings.
Documentation and Records
Inspection and test plans, quality records, lot registers, traceability documentation, and as-built handover packages.
Non-Conformance and Defect Management
Non-conformance reporting, root cause analysis, corrective action tracking, and defect close-out through to handover.
Quality Assurance
Core Expertise
89.7%
Site progress
Group of construction workers gathered around plans on a job site

Quality verified
before it matters

By the time defects show up at handover, they're expensive to fix. We catch issues during construction, when correction is still cheap and the trade is still on site. Independent eyes, structured inspections, and documentation that holds up.

Quality delivered

Quality assurance that respects how construction actually happens and how defects actually get prevented.

Inspections That Match the Risk
Core capability
Inspections That Match the Risk
Hold and witness points placed where they matter. Surveillance frequencies matched to actual risk. Inspections that find issues before they get covered up.

Risk-fit inspections

Caught before it was coveredInspections placed where defects actually happen
Core capability
Documentation That Stands Up
Inspection records, test certificates, and quality documentation that satisfies certifiers, owners, and operators years after handover.

Records aligned

Records that survive scrutinyDocumentation traceable to specification and standard
Documentation That Stands Up
Closed Out Before Handover
Core capability
Closed Out Before Handover
Non-conformances tracked to closure. Defects resolved before practical completion. No surprise lists arriving at handover.

Handover ready

Closed before practical completionNon-conformances and defects resolved during construction

Quality assurance
with an owner's mindset

We do quality assurance the way owners actually need it done. Independent of the builder, structured around real risk, and documented so the asset transfers cleanly into operation.

Independent of the builder

Our role is to protect the owner's interest. Reporting goes to the owner, findings are unfiltered, and inspections aren't shaped by builder convenience.

Risk-based inspection planning

Inspection and test plans built around the real failure modes and concealment risks of the project, not generic checklist templates.

Records the operator can use

Quality records, test results, and certifications structured so the operator and asset manager can actually use them post-handover.

Worker in orange hi-vis vest shovelling fresh concrete on a construction site
Overview
Benefits
$110M
11.20%

Track inspection completion and non-conformance closure

Project metrics

From mobilisation through to handover complete

Quality assurance moves through inspection planning, ongoing surveillance, non-conformance management, defect resolution, and handover documentation. We stay on site across construction so the asset that handovers is the asset that was specified.

Enquire now

A clear quality assurance process

Four stages we run on every quality assurance engagement.

Inspection planning and ITP development

Develop inspection and test plans based on specification, drawings, risk, and the construction sequence the builder is actually following.

Surveillance and verification on site

Conduct inspections at hold and witness points, witness testing, sample materials, and verify workmanship against specification.

Non-conformance and defect management

Raise non-conformance reports, track corrective action through to closure, and verify defects are resolved before practical completion.

Handover documentation and records

Compile quality records, test certificates, as-built data, and handover documentation so the owner inherits a complete, traceable asset record.

Worker standing on scaffolding atop a commercial-scale building
QUALITY ASSURANCE COST
+11.40% ↑
Inspection plan issued
ITP and risk plan complete
$110,300
Quality
QA phases
Inspect, verify, record, report
Inspect
Witness the work
Verify
Test and check
Record
Document the evidence
Report
Brief the team

Got questions? Let's clear them up

What does RECOR's construction quality assurance service cover?

Independent on-site inspections, inspection and test plan development, surveillance and witness testing, non-conformance management, defect tracking, and quality records documentation from mobilisation through to handover.

How is your quality assurance different from the builder's own quality system?

We work for the owner, not the builder. Our inspections, reporting, and records are independent of contractor commercial pressures. We verify what's built matches what was specified, not what was convenient to build.

Do you work alongside the builder's quality team?

Yes. We coordinate with the contractor's quality staff to align inspection schedules, share hold and witness points, and avoid duplication. We provide an independent verification layer, not a replacement for the builder's own ITP system.

What standards and codes do you work to?

Project specifications, contract requirements, Australian Standards relevant to each trade (AS 3600, AS 4100, AS/NZS 3500, AS/NZS 3000, and others), AS/NZS ISO 9001 quality principles, and authority requirements where applicable.

When should QA be brought onto a project?

Ideally during procurement, so we can review ITPs and quality requirements before construction starts. We can also engage after mobilisation, but earlier involvement lets us shape inspection scope around the real construction sequence and risks.

Start the conversation with us, we'd love to help